Brigade Autograph Project Schedule

Featured Image of Brigade Autograph Project Schedule


Brigade Autograph project schedule, as filed with Karnataka RERA, runs from 15 November 2026 to 30 June 2032. Brigade Group splits the work into clear stages, from earthwork and basements to finishing and landscaping. Earthwork runs until March 2027, while the RCC frame of the towers rises from January 2028. The frame wraps up by March 2030, and possession of homes follows on 15 July 2032. This guide gives you each stage with its dates, so you can match your payments to real progress.

What Is the Brigade Autograph Project Schedule?


The project schedule is the stage-wise build plan that Brigade Group filed with Karnataka RERA. It lists each type of work, such as footings, masonry or painting, with a start and end date. The RERA record names the project "Floris & Commercial at Brigade Autograph", a mixed development. Its status on the portal reads as a new project launch. Its RERA number is PRM/KA/RERA/1251/446/PR/071126/009091, and the declared completion date is 30 June 2032.

This plan matters because the developer must report progress against it every quarter on the RERA portal. So it works as a public yardstick for the 21-acre township in Konadasapura, East Bengaluru.

Brigade Autograph Construction Timeline at a Glance


The table below sums up the schedule stage by stage, based on the dates in the RERA filing.

Stage Work Covered Planned Period
Site preparation Earthwork and levelling Nov 2026 to Mar 2027
Foundations Foundation footings Apr 2027 to Jun 2027
Plinth Work up to plinth level Jul 2027 to Dec 2027
Basements Parking floors below ground Apr 2027 to Jun 2028
Super-structure RCC frame, masonry, plastering Jan 2028 to Mar 2030
Services Water, sanitary and electrical lines Jul 2028 to Jun 2030
Interiors Flooring, tiles, doors and windows Jan 2029 to Dec 2030
Finishing Painting, fittings, fire systems Jul 2028 to Jun 2031
Outdoor works Landscaping and external works Jul 2030 to Sep 2031
Elevation Facade and elevation work Jul 2030 to Jun 2032
Completion Project completion 30 June 2032
Possession Handover of homes 15 July 2032

Many stages overlap on purpose, since the site holds seven towers. Crews move from block to block, so one tower can take finishes while another still rises.

Stage 1: Sub-Structure Work (November 2026 to June 2028)


The sub-structure stage covers all work below and up to ground level. It begins with earthwork and levelling from 15 November 2026 to 31 March 2027. The photo on the RERA page already shows a cleared, level plot with a compound wall.

Foundation footings follow from April 2027 to June 2027. Work up to plinth level then runs from July 2027 to December 2027. Each tower sits on four basement levels, so basement floor work stretches from April 2027 to June 2028. These basements hold most of the 3,245 covered parking spaces declared for the project.

Stage 2: Super-Structure Work (January 2028 to January 2031)


The super-structure stage is when you will see the towers climb. The RCC frame is scheduled from January 2028 to March 2030. Tower A alone has 49 slabs and a planned height of 149.9 metres. Spread over 27 months, that comes to about one slab every 17 days.

Masonry and plastering run alongside the frame, also from January 2028 to March 2030. Brigade uses an RCC frame with shear walls and Mivan formwork, which suits this steady floor cycle. Basic water, drain and power lines go in from July 2028 to June 2030. Flooring, skirting and tile work follows from January 2029 to September 2030. Doors, windows and ventilators get fixed from April 2029 to December 2030, and railings by January 2031.

Stage 3: Finishing Works (July 2028 to June 2032)


Finishing work starts early in the lower floors and moves up as each tower tops out. Painting runs from July 2028 to June 2031. Fire-fighting pipes and fittings go in from July 2028 to March 2031. Final power, plumbing and bathroom fittings go in from June 2029 to June 2031.

Weatherproofing of terraces and open surfaces runs from July 2030 to December 2030. Facade and elevation work runs from July 2030 until the completion date of 30 June 2032. Internal and external works, including landscaping as per the sanctioned drawings, run from July 2030 to September 2031.

The RERA schedule does not list wardrobes, kitchen cabinets or puja units in the developer's scope. So plan these interiors yourself after handover, and keep a budget aside for them.

Infrastructure Included in the Schedule


Alongside the towers, the filing commits to a full set of services across the township. Internal works cover water supply, drains, rainwater harvesting, fire safety, waste handling and emergency exits. External works cover these items:

  • Internal roads, footpaths and street lighting across the campus.
  • Storm water drains and a sewage treatment plant.
  • An electricity transformer and substation.
  • Use of renewable energy.
  • Parks and tree planting across the open areas.

Water for the project comes through the local authority, Doddabanahalli Grama Panchayat.

Approvals That Support the Schedule


A schedule is only as strong as the papers behind it. Brigade Autograph holds a BDA-approved plan under number PS/EM/EO-4/TA-4/E/47/2026-27, dated 29 October 2026. The RERA record also lists NOCs from BESCOM, the water board, KSPCB and SEIAA. The Fire Force Department and the Airport Authority of India have issued NOCs too.

The project company, Ananthay Properties Private Limited, owns the full land parcel. BDA has issued A Khatha for it, and the filing declares no litigation on the land. Brigade's own in-house team, active since 1986, is the listed contractor. Buyer funds go into a RERA escrow account with Kotak Mahindra Bank. The total declared project cost stands at about ₹3,673 crore.

How to Track the Schedule as a Buyer


You do not need to rely on sales updates alone to follow the work. Open the project on rera.karnataka.gov.in using the RERA number, then check the quarterly progress reports. Each report shows the status of every stage against the dates in this schedule, along with site photos.

Most stage-linked payment plans tie your instalments to the same milestones, such as plinth, slabs and finishing. So, before each demand note, match the stage on your invoice with the stage on the RERA portal. If handover slips past the declared date, the RERA Act lets you claim interest for the delay.

What the Schedule Means for Your Purchase


The schedule gives you a clear six-year view, so you can plan your money and your move. If you buy now, your larger payments will fall between 2028 and 2031. If you live on rent, you can time your lease to end close to July 2032. Investors can plan for rental income from the second half of 2032.

Homes at Brigade Autograph start at ₹1 Crore for a 1 BHK. The 2, 3 and 4 BHK options go up to 2,800 sq.ft. SBA. For month-by-month updates, follow the Brigade Autograph construction status section. You can also review the specifications and floor plans, or book a visit through the contact page.

FAQs


1. When does construction start at Brigade Autograph?

As per the RERA filing, work starts on 15 November 2026 with earthwork and levelling. This stage runs until 31 March 2027. Foundation work follows from April 2027.

2. What is the completion date of Brigade Autograph as per RERA?

The declared completion date on Karnataka RERA is 30 June 2032. Possession of homes is planned for 15 July 2032. You can confirm both on rera.karnataka.gov.in.

3. When will the towers of Brigade Autograph be built?

The RCC frame of the towers is scheduled from January 2028 to March 2030. Masonry and plastering run during the same period. Each tower rises to 48 floors over four basement levels.

4. When will landscaping and amenities be ready at Brigade Autograph?

Internal and external works, including landscaping, are planned from July 2030 to September 2031. Elevation work continues until 30 June 2032. The clubhouse and common areas get finished within this window.

5. Do the homes at Brigade Autograph include kitchen cabinets and wardrobes?

The RERA schedule does not list wardrobes, kitchen cabinets or puja units in the developer's scope. Check the specification sheet for the exact fittings in your home. Plan your interiors after handover.

6. How can I check if Brigade Autograph is on schedule?

Search the RERA number on rera.karnataka.gov.in and open the quarterly progress reports. These show the status of each stage with site photos. Match them with your construction-linked payment demands.